The following are examples of BMPs:
The Regional Water Quality Control Board requires that all sites implement BMPs and record their implementation on a Water Pollution Control Drawing, also known as a WPCD. The WPCD is often what is required for submittal when applying for your local City or County grading permits. WPCDs are drawn by a storm water QSD or QSP. This project construction map of Best Management Practices shows the location of Storm Drain Inlets, adjacent sensitive resources such as streams or watercourses, and identifies specifically what BMPs shall be implemented and in what location.
BMPs are often implemented in different locations as a project progresses. Grading may require a rock trackout for ingress and egress to a project, silt fence around the perimeter and dust control, while after a project is paved, BMPs such as storm drain inlet protection or landscaping may be needed as construction of buildings and storm drain systems are developed.
It is important to design a project specific to your site. Find a professional in sediment and erosion control, make sure they visit your site and know your specific project needs. Use the Best Management Practices that protect your site well and make the most sense.
Recently environmental law compliance has come into question in our backyard. Two separate lawsuits have…
A month into the storm season and its true- El Nino is here! No doubt…
California has one of the most detailed environmental statutes in the United States. No other…
Both the U.S. Army Corps of Engineers USACOE and the Regional Water Quality Control Board…
Erosion, whether caused by wind or water, can be quite devastating. Erosion in nature can…
So, we recently talked about why dirt is an issue if it isn’t controlled on…
This website uses cookies.